Thursday, August 13, 2009
Eve of shipping
getting all the stuff together. Hoping nothing critical ends up on a boat for 6-8 weeks.
Posted by
max
at
5:32 AM
0
comments
Subscribe to:
Posts (Atom)
life in Grenoble, France as an expat postdoc
life in Grenoble, France as an expat scientist
life in San Francisco, CA as a biotech nerd
life in Grenoble, France as an expat scientist
Blog Archive
- ► 2014 (180)
- ► 2013 (201)
- ► 2012 (174)
- ► 2011 (166)
- ► 2010 (277)
- ▼ 2009 (194)
- ► 2008 (122)
- ► 2007 (185)
- ► 2006 (117)
- ► 2005 (141)
Popular Posts
-
I've heard a lot about the fish market in Tsukiji, so I was determined to visit it during this trip. I have apparently been to Tsukiji...
-
We arrived around noon at Paris-CDG and headed to National to pick up the car that I had booked through AutoEurope.com. Picking up the keys...
-
An early start: the cliffs were calling. One cliff in particular was calling, which we had seen pictures of and looked amazing: R...
-
A friend of mine gave us an abalone which kenji cleaned and sliced up for abalone sashimi. The preparation involves scrubbing off all the b...
-
Not content with our crappy day yesterday, Chloe and I engineered the perfect last day for Oltre: One more try at a crag, lunch in Alassio...
-
Today I climbed Ghost Dog (ED-) near Chamrousse with my friend Francois. I picked him up at 6:30 and we were at tthe trailhead by around 7...
-
The Oddfellows were offering one of their breakfasts again this morning, which we of course attended, followed by a walk around town and a l...
-
The hotel had advertised an included breakfast. Again, having seen some pretty meager hotel breakfasts, I was not expecting much. In any c...
-
I was at a conference for the whole week. Besides the conference itself and the oppressive heat, there isn't much to report about other...