Sunday, August 06, 2006

Foundation

After some beautiful bouldering up at the Grouse Slabs near Donner Summit

we headed back to the cabin, measured and cut the individual pressure treated 4x4s, screwed them into the cement pilings, attached metal brackets, cut 4x8s and screwed them into the metal brackets. We also put two 2x4 joists in



Shortly after putting in the joists, over a beer I realized that we had put one of the 2x4s too close to the edge. argh.

No comments:

life in Grenoble, France as an expat postdoc
life in Grenoble, France as an expat scientist
life in San Francisco, CA as a biotech nerd life in Grenoble, France as an expat scientist

Blog Archive

Popular Posts